Trump Approves Bridger Pipeline Expansion Project
U.S. President Donald Trump has approved development of the 'Keystone Light' pipeline, a $2 billion expansion by Bridger Pipeline LLC to transport Canadian crude oil from Montana to Wyoming with an initial capacity of ~550,000 barrels per day (bpd), potentially expandable beyond 800,000 bpd. Construction is expected to begin in 2027 and finish between late 2028 and early 2029.
Topics: energy environmental opposition oil pipeline U.S.-Canada trade